karlh
Joined: 06 Mar 2002 Posts: 37 Location: Reykjavik, Iceland
|
Posted: Mon Apr 28, 2003 5:56 pm Post subject: Adding graphs to Areas in Graph Trees (right place) |
|
|
Sorry.
I posted this under scipts / Addons, but this should be here
Hi.
I´m wondering.
I have used cacti for about 1 and half years and i like it very much.
There has been one thing bugging me though..
With adding graphs to hireachys is a bitch for me and takes a lot of time.
I have made an example that would probably be usefull, and i think people would like it (my guess).
I have 82 ATM switches with 2000 uplinks, 72 dslams with 25000 customers.
Adding one at a time makes me want to cry
Anyway..
The images before and after are on the following links
http://www.papillon.is/original-add-tree.jpg
And the new one..
http://www.papillon.is/replaced-add-tree.jpg
please comment this
Best regards
Karl Heidar
Network Specialist
(Former H2O Routing Specialist )
_________________
Best regards
Karl Heiðar
Systems Engineer
Iceland Telecom
karlh@macho.is |
|